Rent a GPU cluster on terms worth signing
Rent a GPU cluster of 8 to 1,024+ GPUs for a month or for three years, priced through a full analysis instead of a price page. Size it here, send us the brief, and we take it to providers, line the offers up on one basis and negotiate the contract with you.
Step 1 of 7
Expect questions before any number. Within 24 hours of your request we reply by email with what we need to price it well.
GPU cluster sizes and the work each one fits
A GPU cluster is a set of 8-GPU servers, called nodes, joined by a fast network so they can work on one job. We source three standard sizes, and treat anything above 1,024 GPUs as a custom request on a long-term contract.
Large
Pretraining a model from scratch, or several big training runs back to back. This is the size the service is built around, and where a reserved term makes the biggest dollar difference.
Mid
Full fine-tunes of 30B to 100B+ parameter models, an inference fleet serving a product at steady volume, or mid-size training.
Starter
Fine-tuning and evaluation, a research group's grant-funded run, or inference for one model with predictable traffic.
Filled squares mark the smallest size in each band; outlined squares run to the largest. One square is one 8-GPU server.
Under 8 GPUs, or for a few hours at a time, a self-serve GPU cloud will get you running sooner than a contract will.
The same GPU, priced up to three times apart
List prices for one GPU swing widely from provider to provider, and the biggest contracts aren't priced from a list at all. That spread is the room a cluster analysis works in.
3.1x
between the highest and lowest published H100 on-demand rates: $6.16 against $1.99 per GPU-hour.
$2.1M
a month: the gap between the dearest and cheapest published B300 on-demand rates on a 512-GPU cluster.
25%
below on-demand for a two-year term on one provider's published reserved schedule.
0 of 4
large providers we checked publish a reserved GB300 NVL72 price. It is set contract by contract.
Source: published per-GPU-hour list prices on the public pricing pages of CoreWeave, DigitalOcean, Hyperstack, Lambda, Nebius, RunPod, Together AI, Verda, Voltage Park and Vultr, checked November 2026. Spot, preemptible and serverless rates are left out. The $2.1M figure is 512 GPUs x 730 hours x the $5.65 gap between $13.05 and $7.40. Two-year discount from Verda's reserved schedule. GB300 NVL72 is listed as contact sales by CoreWeave, Nebius, Together AI and Vultr.
Why a list price is only the opening number
A price page tells you what a provider charges a stranger for one GPU-hour this week. A cluster contract is a different purchase. The provider is setting aside hundreds of GPUs for months, and the rate, the deposit, the start date and what happens when a node fails are all open to discussion once a buyer arrives with a clear brief and other bids beside it.
That is the work: getting several providers to price the same written requirements, then pushing each line until the offers are as good as they will get.
| Item | Taking a list price | Through a cluster analysis |
|---|---|---|
| Rate per GPU-hour | Whatever the price page shows for that week | Several providers bid on the same brief, then the best offers are pushed lower |
| What the rate covers | GPUs only; fabric, storage and support may be extra | Every line item priced, so offers compare like for like |
| Cash up front | Deposit or prepayment set by the provider | Deposit size, timing and refund terms negotiated |
| Start date | Best effort | Written into the contract, with a credit if handover slips |
| Failed nodes | Standard support terms | Replacement time and spare nodes agreed for your cluster size |
| End of term | Renewal at the going rate | Extension price, notice period and refresh rights set before you sign |
How a GPU cluster rental analysis works
A GPU cluster analysis runs in six steps, and you decide at the end. Nothing reaches a provider until you say so.
- YouSend the brief
The sizer and the request form. The more you tell us about the job, the better the price we can push for.
- UsQuestions back within 24 hours
We check the size, fabric, storage and term against the work, and push back if the cluster is bigger than the job needs.
- UsTake it to market
With your go-ahead, providers with capacity at your size and region are asked to bid against the same written brief.
- UsLine the offers up
Every offer reduced to one basis: all-in cost per GPU-hour, cash up front, start date, failed-node terms and exit.
- Us, with youNegotiate
Rate, deposit, start-date credits, extension price and the right to move to newer GPUs, pushed on in writing.
- YouDecide and sign
Our recommendation with the reasons. You sign with the provider, and we check the contract matches the offer.
Weeks, not minutes
The first reply comes within 24 hours. After that, the pace is set by how quickly questions are answered on both sides. Most requests reach signed terms in a few weeks; a large reserved cluster takes longer, because providers plan power and racks around it. If you need a number in the next hour, a published price list will serve you better.
You don't pay us for the analysis. If you sign with a provider we brought in, that provider pays our fee.
What we will ask you for
Good offers come from a precise brief. A provider that knows the job, the dates and the budget can price tightly; one that doesn't adds margin for the unknowns. Expect us to ask for all of this, over the form and the first few emails:
The work
- What the cluster will run, and the model size in parameters
- Training data in tokens, if you are training
- How busy the cluster will be across a typical week
The cluster
- GPU type, or the deadline that should decide it
- GPU count now and where it could grow
- Fabric, shared storage in TB, orchestration and region
The money
- Funding stage and who signs the contract
- Monthly budget range and whether it is approved
- Whether a deposit or prepayment can be covered
What you have now
- Your current GPU setup and roughly what it costs
- Any offers already in hand, which we can line up with new ones
- Start date, and the date a decision is due
Want to gather it first? The brief below has every question in one sheet.
- GPU cluster brief (CSV)Every question we ask, with a column for your answers. Opens in Excel or Google Sheets.
B300 rental and the other GPUs we source
B300 rental is where most large requests should start: it is NVIDIA's Blackwell Ultra GPU, with 2.1 TB of GPU memory in each 8-GPU server and up to 800 Gb/s of network per GPU. B200 is the step below it. H200 and H100 are the Hopper generation, still in wide use and priced lower.
| GPU | Packaging | GPU memory | NVLink | Network between servers | Best fit |
|---|---|---|---|---|---|
| B300 | Blackwell Ultra, 8 per server | 2.1 TB per 8-GPU server | 1.8 TB/s per GPU, 8-GPU domain | Up to 800 Gb/s per GPU (ConnectX-8) | Pretraining and long-context work where memory per GPU sets the batch size |
| GB300 NVL72 | Blackwell Ultra, 72 per rack with 36 Grace CPUs | 20 TB per 72-GPU rack | 130 TB/s across one 72-GPU domain | 800 Gb/s per GPU (ConnectX-8) | Very large models that need one NVLink domain bigger than a server |
| B200 | Blackwell, 8 per server | 1,440 GB per 8-GPU server | 1.8 TB/s per GPU, 8-GPU domain | Up to 400 Gb/s per GPU (ConnectX-7) | Training and fine-tuning at a lower rate than B300 |
| H200 | Hopper, 8 per server | 141 GB per GPU, 1,128 GB per server | 900 GB/s per GPU, 8-GPU domain | Up to 400 Gb/s per GPU (ConnectX-7) | Inference on large models that fit in 141 GB per GPU |
| H100 | Hopper, 8 per server | 80 GB per GPU, 640 GB per server | 900 GB/s per GPU, 8-GPU domain | Up to 400 Gb/s per GPU (ConnectX-7) | Fine-tuning, mid-size training and steady inference at the lowest rate |
Source: NVIDIA product and specification pages for H100, H200, HGX B200 and B300, DGX B200, DGX B300, GB200 NVL72 and GB300 NVL72, and the DGX H100/H200 user guide, checked November 2026.
B200 cluster or B300 cluster?
Inside the server, both link their GPUs over NVLink at the same 1.8 TB/s each. B300 adds memory (2.1 TB per server against 1,440 GB) and doubles the network per GPU, which pays off when one job spreads over dozens of nodes. If your model and batch fit on B200 and the job stays at a few nodes, a B200 cluster is worth pricing side by side with B300, and we will ask providers to bid both.
Where an H100 cluster still fits
H100 has the lowest published rates of the five and handles most fine-tuning and inference well. For new pretraining at scale, the newer GPUs finish the same job in fewer GPU-hours. Sizes and prices are on the H100 cluster page.
NVL72 rental: GB300 NVL72 and GB200 NVL72 racks
NVL72 rental means renting whole racks instead of servers. A GB300 NVL72 rack joins 72 Blackwell Ultra GPUs and 36 Grace CPUs in one NVLink domain, with 130 TB/s of NVLink bandwidth and 20 TB of GPU memory, so a model can be split across all 72 GPUs as if they sat in one machine. GB200 NVL72 is the earlier rack: 72 Blackwell GPUs, 13.4 TB of HBM3E and the same 130 TB/s.
GB300 rental is priced per contract. We found one published per-GPU-hour rate and no published reserved rates, so this is where a competitive brief matters most. Rack counts round up: 256 GPUs means four racks, or 288 GPUs.
What an AI cluster rental includes
An AI cluster rental is more than a count of GPUs. You are renting four things, and each one belongs in the price an offer quotes.
- Nodes. 8-GPU servers with their own CPUs, system memory and local drives. Inside each node, NVLink ties the GPUs together: 900 GB/s per GPU on Hopper, 1.8 TB/s on Blackwell.
- The fabric. The network between nodes, InfiniBand or RoCE Ethernet, at up to 400 Gb/s per GPU on H100, H200 and B200 and 800 Gb/s on B300 and GB300. For training, ask for a non-blocking fabric so every node reaches every other at full speed.
- Storage. A shared file system the nodes read training data from and write checkpoints to. Find out how many TB are included and what more costs.
- Management. Who installs drivers and the OS image, who runs Kubernetes or Slurm if you want either, and how fast someone acts when a node fails.
Reserved GPU cluster terms versus on-demand GPU rental
A reserved GPU cluster costs less per GPU-hour than on-demand GPU rental because the provider can plan around your contract. Published lists show the gap: H200 reserved rates run $2.79 to $4.15 per GPU-hour against $3.99 to $7.04 on demand, and B200 runs $5.10 to $8.87 reserved against $6.00 to $9.75 on demand.
On one price list, a 12-month H100 commitment is about 26 percent below the same provider's on-demand rate. On-demand still makes sense for a few days of testing. Teams that rent GPU capacity by the hour for months tend to run into two problems: the size of the bill, and getting the same GPUs back after a restart. A reserved cluster settles both, because the nodes are held for you for the term at a rate fixed in writing.
Source for the 26 percent figure: DigitalOcean GPU Droplets pricing page, $3.26 per H100 GPU-hour on a 12-month commitment against $4.41 on demand, checked November 2026.
| GPU | On-demand, per GPU-hour | Reserved, per GPU-hour |
|---|---|---|
| B300 | $7.40 to $13.05 | $7.94 to $9.89 |
| GB300 NVL72 | $15.01 (one published rate) | Not published; quoted per contract |
| B200 | $6.00 to $9.75 | $5.10 to $8.87 |
| H200 | $3.99 to $7.04 | $2.79 to $4.15 |
| H100 | $1.99 to $6.16 | $1.99 to $3.45 |
Source: published per-GPU-hour list prices on the public pricing pages of CoreWeave, DigitalOcean, Hyperstack, Lambda, Nebius, RunPod, Together AI, Verda, Voltage Park and Vultr, checked November 2026. Spot, preemptible and serverless rates are left out.
Monthly figures for each size are on the GPU cluster pricing page, and how term length moves the rate is on the GPU leasing page.
Rent a GPU server: one 8-GPU node
If you want to rent a GPU server rather than a whole cluster, one 8-GPU node is the smallest size we handle. It suits a fine-tune that fits in one server's memory, an evaluation suite, or a single model in production, on a term of one month or longer.
A single B300 server carries 2.1 TB of GPU memory; a single H100 server carries 640 GB. Tell us the model and how long you need it, and we will ask providers to bid both so you can compare cost per finished job.
What to check before you sign a cluster contract
- Start date. Written into the contract, with a credit if handover slips.
- Failed nodes. How fast a broken node is replaced, and whether spares are held for your cluster.
- Network and storage. The fabric and the shared storage you need, included in the price and not added later.
- End of term. How your data is wiped and whether the provider confirms it in writing.
- Extensions. The rate for extra months, and how much notice you must give.
- Deposit. How much is paid up front, and when it is applied to invoices or returned.
Each of these is negotiated alongside the rate during an analysis. The sizer turns them into a checklist matched to your cluster size and term.
Who this is for, and who it isn't
A good fit
- AI startups and labs with funding, training or fine-tuning for months rather than hours.
- Companies running inference at steady volume that want reserved capacity at a fixed monthly price.
- Teams moving off on-demand GPUs because the bill or the wait list grew too large.
- Research groups and universities with grant-funded runs that last months.
Better served elsewhere
- Fewer than 8 GPUs, or GPUs by the hour. A self-serve GPU cloud is faster for that.
- Anyone after a single number today with no plans to share requirements.
- Crypto mining.
- GPU providers, brokers and resellers. There is a short note for you.
The team behind this site
Rent GPU Cluster belongs to Metro Colo Advisory, an independent firm that sources data center space and GPU capacity for the companies buying it. No GPU provider owns any part of it.
Our team has been quoted in Fortune, Inc., Al Jazeera and Light Reading.
- Where our fee comes from
- You don't pay us for the analysis. If you sign with a provider we brought in, that provider pays our fee.
- Whose side we're on
- Yours. We recommend the offer that fits the job, including the cheapest one.
- How we work
- By email, in writing, from the first reply to the signed contract.
Questions about renting a cluster
What is the smallest cluster you will source?
One 8-GPU server for at least one month. For fewer GPUs, or for a few hours, a self-serve GPU cloud will get you running sooner.
Can you just send me a price?
Not a useful one. A contract price depends on the size, term, start date, location, deposit and what capacity the provider has open, so we ask questions first and then take a written brief to several providers. If you only need a number today, published price lists are the faster route.
How long does an analysis take?
You get questions back within 24 hours. From there it runs on how fast both sides answer: usually a few weeks to signed terms, and longer for large reserved clusters, where providers have to plan capacity around you.
What does it cost me?
You don't pay us for the analysis. If you sign with a provider we brought in, that provider pays our fee. We still recommend the offer that fits the job best, including the cheapest.
Can you look at offers I already have?
Yes. Send them with the request. We put them on the same basis as any new bids, so you can see where each one is soft before you sign.
Can I rent B300 or GB300 capacity in North America?
Yes. Those are the GPUs we lead with for clusters of 256 GPUs or more. GB300 comes in 72-GPU NVL72 racks, and its reserved pricing is set per contract.
Will the provider ask for a deposit?
Often, especially from newer companies on reserved terms. It may be a deposit or part of the term paid up front. The amount and timing are negotiable, so the request form asks whether you could cover one.
Can the cluster run in Europe?
Yes. We source in North America first and in Europe on request. Choose Europe or either on the form.